Panel: Optimizing Project Delivery With Design Build to Enhance Collaboration Between Project Teams

Time: 11:20 am
day: Day Two

Details:

  • Fostering early collaboration between client and design teams to ensure designs are optimized for constructability
  • Setting out design parameters early to avoid rework and accelerate project timelines
  • Implementing value engineering principles throughout the design-build process to optimize project costs without sacrificing on quality or functionality
  • Leveraging iterative design cycles and feedback loops between teams to adapt to changing project requirements

Speakers: